Skip to content
10,515 NCM codes · 5,612 HS headings
Data: May 2026
Last updated: May 2026

NCM 2522.20.00

Slaked lime; excluding calcium oxide and hydroxide of heading no. 2825

Brazil import duty rates — Updated May 2026

3.6%
Import Duty (II)
NT
IPI
Ex-Tarifário
Calc
Full landed cost

NCM 2522.20.00 is the Brazilian tariff code for slaked lime; excluding calcium oxide and hydroxide of heading no. 2825. This code carries 3.6% import duty (II) and no IPI (tax not levied). EU-origin products in this category benefit from the EU-Mercosur trade agreement.

Classification hierarchy

2522Quicklime, slaked lime and hydraulic lime; other than calcium oxide and hydroxide of heading no. 2825
2522.20.00
Slaked lime; excluding calcium oxide and hydroxide of heading no. 2825

Official Brazilian text: - Cal apagada

Tax breakdown for NCM 2522.20.00

Import Duty (II)Imposto de Importação
3.6%
IPIExcise tax
NT
PIS/COFINSSocial contributions
11.75%
ICMSState VAT — varies by state
17–20%
AFRMMMaritime freight surcharge
8%
Calculate exact landed cost →

Taxes are cascading — each applies on a different base. Use the calculator for the exact total.

Trade overview — HS 2522.20

UN Comtrade 2024

Brazil imported $2.0M of products under HS heading 2522.20 in 2024. Top suppliers:

1Mexico
$1.4M70.5%
2Spain
$351K17.3%
3Belgium
$161K8%
4Japan
$23K1.1%
5France
$22K1.1%

Trade data is at the 6-digit HS level. See full HS 2522.20 details →

EU-Mercosur impact

Already low tariffs. Full elimination for most products within 4 years.

How to import NCM 2522.20.00 into Brazil

  1. Confirm with your customs broker — NCM 2522.20.00 must exactly match your product description. Misclassification leads to fines and seizure.
  2. Calculate total cost — base import duty is 3.6%, but Brazil adds IPI (NT), PIS/COFINS (11.75%), ICMS (17–20%), and AFRMM (8%) on top. Use our calculator for the exact total.
  3. Get import licenses — check if your specific product requires ANVISA, INMETRO, or MAPA clearance.
  4. Choose entry port — ICMS varies by state (17–20%). Compare state rates to optimize your route.

Calculate your landed cost for NCM 2522.20.00

Enter CIF value and get a breakdown of all 7 Brazilian import taxes.